A SELECTION OF COMPLETED WORK
TO DATE WE HAVE COMPLETED OVER 7,000 JOBS
YEAR/CUSTOMER
|
JOB DESCRIPTION
|
IN EXCESS OF $
|
1992
|
|
|
WILMINGTON, CA
|
LOW-NOX BURNER INSTALLATION
|
158 THOUSAND
|
TORRANCE, CA
|
TRUCK UNLOADING RACK
|
196 THOUSAND
|
WILMINGTON, CA
|
TK RESID CONVERSION
|
418 THOUSAND
|
1993
|
|
|
CARSON, CA
|
RUN WESTSIDE FIRE PROTECTION PIPING
|
409 THOUSAND
|
LONG BEACH, CA
|
TERMINAL MECHANICAL MAINT.
|
216 THOUSAND
|
AN PEDRO, CA
|
PIPELINE HYDROTEST
|
356 THOUSAND
|
1994
|
|
|
WILMINGTON, CA
|
SOUTHWEST FW LOOP & NORTHWEST FW LOOP
|
1.1 MILLION
|
WILMINGTON, CA
|
1.2 MILE PIPELINE
|
1.3 MILLION
|
WILMINGTON, CA
|
180,000 BARREL TANK FARM
|
3 MILLION
|
1995
|
|
|
WILMINGTON, CA
|
6" & 12" WATER PIPELINES
|
220 THOUSAND
|
CARSON, CA
|
DRAIN DRY WATER VAPOR RECOVERY SYSTEM
|
313 THOUSAND
|
ROSEMEAD, CA
|
12" & 16" PIPELINES VARIOUS LOCATIONS
|
320 THOUSAND
|
1996
|
|
|
WILMINGTON, CA
|
HYDROTESTS
|
108 THOUSAND
|
LONG BEACH, CA
|
STEAM FLOOD CTI WELL SITE
|
98 THOUSAND
|
WILMINGTON, CA
|
RELOCATE RAILCAR LOADING RACK
|
405 THOUSAND
|
1997
|
|
|
LONG BEACH, CA
|
PARCEL A, DVM & COOLER PIPING
|
227 THOUSAND
|
ROSEMEAD, CA
|
TIE-IN
|
9 THOUSAND
|
WILMINGTON, CA
|
ACID UPGRADE
|
234 THOUSAND
|
1998
|
|
|
WILMINGTON, CA
|
98 SHUT DOWN FABRICATE PIPING UNIT 110
|
208 THOUSAND
|
WILMINGTON, CA
|
WASTE WATER TREATMENT PLANT
|
530 THOUSAND
|
CARSON, CA
|
PIPE AND EQUIPMENT TRAIN PROJECT
|
741 THOUSAND
|
SANTA FE SPRGS, CA
|
INSTALL 17 UNDERGROUND STORAGE TANKS
|
215 THOUSAND
|
1999
|
|
|
CARSON, CA
|
PIPELINE REPAIR, SAWCUT & POTHOLE
|
250 THOUSAND
|
ROSEMEAD, CA
|
BLANKET PIPELINE REPAIR
|
2 MILLION
|
LONG BEACH, CA
|
PIPE SUPPORT FOUNDATIONS & 12,000
|
503 THOUSAND
|
2000
|
|
|
CARSON, CA
|
2800 OF 12 HDPE WASTE WATER LINE
|
450 THOUSAND
|
CARSON, CA
|
4 N2 PIPELINE
|
491 THOUSAND
|
LOS ANGELES, CA
|
CNGC PLANT
|
379 THOUSAND
|
2001
|
|
|
CARSON. CA
|
FIRE WATER SYSTEM
|
252 THOUSAND
|
TORRANCE, CA
|
ALUMINA PROJECT
|
390 THOUSAND
|
WILMINGTON, CA
|
H3 HEATER FOUNDATION
|
744 THOUSAND
|
2002
|
|
|
WILMINGTON, CA
|
CARB III
|
1.2 MILLION
|
WILMINGTON, CA
|
RELOCATE RAIL CAR LOADING RACK
|
1.4 MILLION
|
CARSON, CA
|
REPAIR TO 24 CRUDE
|
444 THOUSAND
|
LONG BEACH, CA
|
HUNTINGTON BEACH BRIDGE MODIFICATIONS
|
820 THOUSAND
|
2003
|
|
|
LONG BEACH, CA
|
LOADING RACK & CANOPY
|
257 THOUSAND
|
CARSON, CA
|
MANIFOLD 10,000
|
172 THOUSAND
|
ORANGE, CA
|
RELOCATE 8 JET FUEL PIPELINE
|
483 THOUSAND
|
2004
|
|
|
LONG BEACH, CA
|
PHASE II ETHANOL RAIL CAR UNLOADING
|
1.1 MILLION
|
CATALINA, CA
|
SCR INSTALLATION PEBBLY BEACH CATALINA
|
1.5 MILLION
|
CARSON, CA
|
RELOCATE 8 LUBE LINES
|
348 THOUSAND
|
WILMINGTON, CA
|
REE UPGRADE UNIT 60 & 80 CTS FOR SOUTH FLARE
|
318 THOUSAND
|
2005 TO DATE
|
|
|
ROSEMEAD, CA
|
CONCRETE SPILL CONTAINMENT FOUNDATION
|
592 THOUSAND
|
LONG BEACH, CA
|
INSTALL 24 VALVE
|
255 THOUSAND
|
CARSON, CA
|
DIESEL UPGRADE
|
387 THOUSAND
|
CARSON, CA
|
SUCTION LINES B, D & E
|
185 THOUSAND
|
|